Bathroom remodeling

Waterproofing you will never see, done to the standard that decides whether tile lasts 3 years or 30.

Sample range
$19,000 to $52,000
Time on site
3 to 6 weeks on site
Renovated bathroom with tiled walk-in shower and a floating vanity

What we are actually solving

Bathrooms are the smallest rooms we build and the ones most likely to go wrong later. Almost every failed shower we tear out failed for the same three reasons: no proper slope to the drain, a waterproofing membrane that stopped short of the curb, and a niche cut into an exterior wall with no insulation behind it.

We build showers over a bonded sheet membrane with a pre-sloped pan, flood test every one for 24 hours before tile goes on, and photograph the test for your project file. It adds a day. It is the day that matters.

Typical crew: Lead carpenter, tile setter, licensed plumber and electrician

Line by line

What is included

This is the scope you would see in your proposal, written the way we write it rather than the way a brochure does.

Full gut to the studs

Old tile, substrate, tub and fixtures out, framing inspected, rot and termite damage repaired before anything new goes in.

Waterproofing and flood test

Bonded sheet membrane, pre-sloped pan, sealed corners and curb, flood tested for 24 hours and documented with photos.

Plumbing and venting

New supply, waste and vent as needed, pressure balancing valves, and a proper exhaust fan ducted outside rather than into the attic.

Tile and stone

Large-format walls, mosaic or sheet floor, laser-set layout so cuts land where you will not stare at them.

Vanity, glass and fixtures

Vanity set and scribed, custom glass measured after tile, mirrors, lighting and accessories installed.

Accessible options

Curbless entry, blocking for future grab bars, comfort-height fixtures and slip-rated floor tile when you ask for them.

Why it matters

Three things that change the outcome

Documented flood test

Every shower pan is flood tested and photographed. The file goes to you with the warranty.

One bathroom, one crew

The same lead carpenter is there from demolition to the final caulk line.

Built for the next 20 years

Blocking for grab bars goes in on every job, whether or not you want the bars today.

How it runs

From first call to punch list

The full process
  1. 01

    Phone call

    15 minutes, no visit yet

  2. 02

    Site visit

    About an hour, free

  3. 03

    Design and selections

    Paid agreement, credited back

  4. 04

    Fixed-price proposal

    Line-item scope, no vague lumps

  5. 05

    Permits and pre-construction

    The part nobody photographs

  6. 06

    Construction

    Weekly meetings, daily photos

  7. 07

    Punch list and follow-up

    Be picky, that is the point

Where the money goes

What moves the price on this work

Compare these against any other bid you are holding. If a line is missing from one of them, the prices are not comparable.

  • Moving the toilet or shower drain, which means opening the floor
  • Tub-to-shower conversions and curbless entries
  • Tile size, pattern and how much of it is stone
  • Custom glass versus a stock door
  • Whether the room has a vented fan and a dedicated circuit today
  • Second-floor bathrooms over finished ceilings
Detail from a Buildwell bathroom remodeling project
Bathroom remodeling project in Compton Heights

Case study

A primary bath carved out of a 1904 brick four-square

Two small rooms and a closet became one curbless bath without losing a bedroom.

Budget
$48,000 to $52,000
Timeline
6 weeks on site
Neighborhood
Compton Heights
Read the case study

Bathroom remodeling questions

Something not covered here? Call us, it is a two minute answer most of the time.

All questions

Honestly, no, not to this standard. Mortar, membrane, thinset and grout all need cure time, and the flood test alone takes a day. A three week bathroom is the fastest we will schedule without cutting something we would rather not cut.

If you plan to stay in the home, yes. It is easier to clean, it looks larger, and it removes the single most common fall hazard in the house. It costs more because the floor framing usually has to be dropped or the drain relocated.

We inspect it on every job and replace what is soft, stained or springy. Around toilets and tub aprons in homes older than 1960, we replace subfloor more often than not.

Yes. We will tell you honestly if a tile is difficult to set, because some natural stone and long thin formats add labor hours. Client-supplied material is warranted for our installation, not for the product itself.

Free estimate

Ready to price your bathroom remodeling

A free site visit, measurements and photographs, then a written ballpark range within three business days.

See financing options

742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.