Licensed, bonded and lead-safe certified in Missouri

96%of 2025 clients would hire us again (sample figure)

Book your renovation: (314) 555-0159

Service

Kitchen remodeling

The room your whole house runs through, rebuilt around how you actually cook.

Sample range
$34,000 to $115,000
Time on site
6 to 11 weeks on site
Renovated kitchen with an island, stone counters and new cabinetry

What we are actually solving

A St. Louis kitchen is rarely a blank box. Most of the homes we work in were built between 1900 and 1975, which means plaster over lath, a chimney chase in the wrong place, cast iron waste lines and a panel that was never sized for an induction range. We plan around all of it before we price the job, so the surprises show up on paper instead of on day nine.

Our kitchen work runs from a cabinet-and-counter refresh in a Dogtown bungalow to taking down the wall between a Ladue ranch kitchen and its dining room, moving the sink to the window and running a new 60 amp feed to the island. Same crew, same process, different scope.

Typical crew: Lead carpenter, apprentice, tile setter, licensed electrician and plumber

Line by line

What is included

This is the scope you would see in your proposal, written the way we write it rather than the way a brochure does.

Measured existing plans

We laser-measure the room and draw what is actually there, including the out-of-square walls, before any design happens.

Layout and 3D design

Two or three plan options with elevations and a walkthrough view, revised with you until the traffic paths and landing zones work.

Demolition and dust control

Negative-air dust containment at every opening, floor protection on the path in, and a dumpster staged where it will not kill your lawn.

Structural and MEP

Beam sizing stamped by our engineer when a wall comes out, plus electrical, plumbing and HVAC rough-in to current St. Louis code.

Cabinetry and stone

Semi-custom or full-custom boxes, installed plumb and scribed to the walls. Stone templated after cabinet install, never before.

Tile, paint and finish carpentry

Backsplash, trim, doors, hardware, touch-up and the punch list walk with the project manager before you write the last check.

Why it matters

Three things that change the outcome

One crew, not five subs you chase

Carpenters, tile setters and painters are on our payroll. We schedule them, not you.

Allowances you can actually shop

Your proposal names real products at real prices, so an upgrade is a decision, not a surprise invoice.

A kitchen you can live beside

Temporary sink and fridge setup in the dining room or garage on any job scheduled past three weeks.

How it runs

From first call to punch list

The full process
  1. 01

    Phone call

    15 minutes, no visit yet

  2. 02

    Site visit

    About an hour, free

  3. 03

    Design and selections

    Paid agreement, credited back

  4. 04

    Fixed-price proposal

    Line-item scope, no vague lumps

  5. 05

    Permits and pre-construction

    The part nobody photographs

  6. 06

    Construction

    Weekly meetings, daily photos

  7. 07

    Punch list and follow-up

    Be picky, that is the point

Where the money goes

What moves the price on this work

Compare these against any other bid you are holding. If a line is missing from one of them, the prices are not comparable.

  • Whether walls, chimneys or load-bearing headers move
  • Cabinet construction: stock, semi-custom or shop-built
  • Counter material, edge profile and the number of seams
  • Panel capacity and how far the new circuits have to travel
  • Floor condition under the old cabinets and whether it gets patched or replaced
  • Appliance package, especially vented hoods through masonry walls
Detail from a Buildwell kitchen remodeling project
Kitchen remodeling project in Ladue

Case study

A 1962 Ladue ranch kitchen opened to the garden

Two walls out, a 22 foot beam in, and a kitchen that finally sees the back yard.

Budget
$96,000 to $104,000
Timeline
9 weeks on site
Neighborhood
Ladue
Read the case study

Kitchen remodeling questions

Something not covered here? Call us, it is a two minute answer most of the time.

All questions

Plan on the full on-site window, usually six to eleven weeks. We set up a temporary kitchen with a sink, fridge and counter in an adjacent room during week one, and we give you a dated schedule at the pre-construction meeting so you can plan meals and guests around it.

Sometimes. If the boxes are plywood, square and the layout already works, refacing with new doors, drawer boxes and hardware can save a meaningful share of the budget. If they are particle board, water damaged or you are moving the sink, replacement is the better spend.

In St. Louis City and most county municipalities, yes, as soon as electrical, plumbing or structural work is involved. We pull the permits, meet the inspectors and include the fees in your proposal.

You do, with our selections lead. You get an allowance sheet, a shortlist at each price point and showroom appointments already booked. Most clients finish selections in two or three sessions.

We stop, photograph it, price the fix and send you a written change order before anyone swings another hammer. Roughly one kitchen in three turns up something hidden, most often old wiring or a leak behind the sink wall.

Free estimate

Ready to price your kitchen remodeling

A free site visit, measurements and photographs, then a written ballpark range within three business days.

See financing options

742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.