Our process

Seven stages, and the pricing rules behind them

The same sequence runs on a three week bathroom and a fourteen month gut. What changes is how long each stage takes, not what happens in it.

Stages
7
Site visit
Free
Ballpark range
3 business days
Architectural drawings and measurements on a work table

Seven stages, and you always know which one you are in

Every project runs the same way, whether it is a three week bathroom or a fourteen month gut. Here is the whole thing.

Read the full process
  1. Stage 01

    Phone call

    15 minutes, no visit yet

    We ask what you want to change, roughly what you hope to spend and when you would like to start. If your project is not a fit for us, this is where we say so and point you somewhere better.

    Typical time
    Same week
    Your part
    Tell us the room, the goal and a rough budget band.
  2. Stage 02

    Site visit

    About an hour, free

    Marcus or a project manager walks the space with you, measures, photographs, checks the panel and the plumbing, and talks through what is realistic. You get a written ballpark range within three business days.

    Typical time
    Within 5 business days
    Your part
    Show us the space and the things that annoy you about it.
  3. Stage 03

    Design and selections

    Paid agreement, credited back

    Measured plans, two or three layout options, elevations and a 3D walkthrough. Priya runs selections sessions with real allowances and booked showroom appointments until every material is chosen and priced.

    Typical time
    3 to 8 weeks
    Your part
    Make decisions. We narrow the options so there are never more than three.
  4. Stage 04

    Fixed-price proposal

    Line-item scope, no vague lumps

    A scope document that names every item, an allowance sheet with real products, a dated schedule and the payment milestones. You sign a number, not an estimate.

    Typical time
    1 week
    Your part
    Read the exclusions section first. We mean that.
  5. Stage 05

    Permits and pre-construction

    The part nobody photographs

    We submit drawings, answer plan review comments, order long-lead materials and hold the pre-construction meeting on site where we set the containment, the dumpster and the crew access.

    Typical time
    3 to 10 weeks
    Your part
    Empty the room and tell the neighbors.
  6. Stage 06

    Construction

    Weekly meetings, daily photos

    Demolition, rough-in, inspection, close-up, finishes. One project manager, a standing weekly on-site meeting, a shared photo log updated every day and a broom-clean site every evening.

    Typical time
    3 weeks to 14 months
    Your part
    Come to the weekly meeting. Ask anything.
  7. Stage 07

    Punch list and follow-up

    Be picky, that is the point

    We walk the finished space with a bright light and write down everything. Final payment comes after the list is cleared, not before. Then we check in at 30 days, six months and a year.

    Typical time
    1 to 2 weeks
    Your part
    Find the flaws. Nothing on that list offends us.

The part nobody explains properly

How our pricing actually works

Read this before you compare us to anyone else. Two bids with the same bottom line can be very different contracts.

Fixed price, not time and materials

You sign a line-item scope with a single number. It changes only when you change the scope or when we hit a genuine hidden condition, and both require a written change order you approve first.

Allowances name real products

Every allowance on your sheet points at a specific product at a specific price. A low allowance is the most common way a contract price quietly becomes a bigger one.

Payments follow completed work

A deposit at signing, then progress payments tied to milestones you can see: rough-in inspection passed, drywall complete, cabinets installed. The final payment is due after the punch list, not before.

Design fees credit back

Pre-construction design is a paid agreement because it produces real drawings and real prices. That fee is credited against the construction contract when you sign it.

Contingency is yours, not ours

We recommend you hold 10 to 15 percent on pre-1960 homes and 5 to 10 percent on newer ones. Most clients never spend it. It is your money and it stays that way.

Change orders are written, always

We stop, photograph, price and email. Nothing proceeds on a handshake, which protects you far more than it protects us.

Project manager walking a client through the schedule on site

While the work is happening

What communication looks like on a live job

  • A standing weekly meeting on site. Thirty minutes with your project manager, at the same time each week, for the whole project.
  • A shared photo log updated daily. Every wall photographed before it closes, so you know where the wires and pipes run forever.
  • A three week look-ahead every Monday. Which trades are coming, what needs deciding, and what might slip.
  • One mobile number. Your project manager's, not a general office line and not a subcontractor's.
  • A broom-clean site every evening. Containment checked each morning by the superintendent before work starts.

Questions about how it runs

These come up at almost every pre-construction meeting.

All questions

For a kitchen, bathroom, basement or a single addition, yes, and most clients do. For a full gut, we recommend moving out because containment slows the crew and adds weeks. We set up dust containment, protect the path in, and clean the site at the end of every working day either way.

Typically 7:30am to 4:00pm, Monday to Friday. We do not start earlier than the local noise ordinance allows, and we do not work weekends unless the schedule slipped for a reason that was ours.

Your project manager. One person, whose mobile number you have, who runs a standing weekly meeting on site and updates the shared photo log daily. You are never chasing a subcontractor for an answer.

We stop, photograph it, price it and send you a written change order. Nothing proceeds until you approve it. About one project in three on a pre-1960 home turns up something hidden, most often old wiring, a past leak or framing that was modified by someone who should not have.

Our carpenters, painters, tile setters and site staff are W-2 employees. Electrical, plumbing, HVAC, concrete and abatement are licensed trade partners we have worked with for years, and they carry their own insurance which we verify annually.

Free estimate

Start at stage one

A fifteen minute phone call. We will tell you whether your project is a fit for us before either of us spends an afternoon on it.

See financing options

742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.