Licensed, bonded and lead-safe certified in Missouri

96%of 2025 clients would hire us again (sample figure)

Book your renovation: (314) 555-0159

Eight things we build

Remodeling services across the St. Louis metro

Every service below is delivered by our own carpentry crews and the licensed trade partners we have worked with for years. One schedule, one project manager, one fixed price.

Projects since 2009
742
Workmanship warranty
3 years
Minimum project
$15,000
Completed kitchen remodel with new cabinetry and stone counters

Licences, insurance and guarantees

Licensed and bonded

Missouri contractor registration #RE-0000000 (sample)

EPA Lead-Safe certified

Firm certification NAT-F193742-1 (sample), RRP trained crews

$2M general liability

Certificate issued directly to you on request

W-2 carpentry crews

Workers' compensation carried on every employee

NARI member

National Association of the Remodeling Industry, St. Louis chapter

3 year workmanship warranty

Written, transferable once, with a named claims process

Seven stages, and you always know which one you are in

Every project runs the same way, whether it is a three week bathroom or a fourteen month gut. Here is the whole thing.

Read the full process
  1. Stage 01

    Phone call

    15 minutes, no visit yet

    We ask what you want to change, roughly what you hope to spend and when you would like to start. If your project is not a fit for us, this is where we say so and point you somewhere better.

    Typical time
    Same week
    Your part
    Tell us the room, the goal and a rough budget band.
  2. Stage 02

    Site visit

    About an hour, free

    Marcus or a project manager walks the space with you, measures, photographs, checks the panel and the plumbing, and talks through what is realistic. You get a written ballpark range within three business days.

    Typical time
    Within 5 business days
    Your part
    Show us the space and the things that annoy you about it.
  3. Stage 03

    Design and selections

    Paid agreement, credited back

    Measured plans, two or three layout options, elevations and a 3D walkthrough. Priya runs selections sessions with real allowances and booked showroom appointments until every material is chosen and priced.

    Typical time
    3 to 8 weeks
    Your part
    Make decisions. We narrow the options so there are never more than three.
  4. Stage 04

    Fixed-price proposal

    Line-item scope, no vague lumps

    A scope document that names every item, an allowance sheet with real products, a dated schedule and the payment milestones. You sign a number, not an estimate.

    Typical time
    1 week
    Your part
    Read the exclusions section first. We mean that.
  5. Stage 05

    Permits and pre-construction

    The part nobody photographs

    We submit drawings, answer plan review comments, order long-lead materials and hold the pre-construction meeting on site where we set the containment, the dumpster and the crew access.

    Typical time
    3 to 10 weeks
    Your part
    Empty the room and tell the neighbors.

Free estimate

Not sure which of these you need

Tell us what is annoying you about the space. Most of our projects start as one service and end up as a different one, and the site visit is where that gets sorted out.

See finished projects

742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.