Licensed, bonded and lead-safe certified in Missouri

96%of 2025 clients would hire us again (sample figure)

Book your renovation: (314) 555-0159

Service area

Remodeling in Chesterfield

1980s to 2000s two-story, larger lots, newer subdivisions

County
St. Louis County
From our shop
27 minutes from our shop
ZIP codes
63017, 63005
Homes in Chesterfield, Missouri

Working in Chesterfield

Chesterfield is newer construction, which means fewer surprises behind the walls and more work about layout and finish level. The most common request is opening the kitchen to the two-story family room and rebuilding a primary bath that was built to a 1995 spec.

Most of the subdivisions have an HOA with architectural review for anything visible from the street, including decks and exterior color. We handle those submissions as part of the permit package.

What Chesterfield houses throw at us

Three things we see here again and again

1990s primary baths

Corner jetted tubs, cultured marble and a shower too small to use. Almost all of these become a large walk-in shower and a real vanity.

Kitchen and family room walls

Usually non-structural or carrying a small point load. Opening them is straightforward once we confirm the truss layout.

Decks reaching end of life

A lot of the original treated decks are hitting 25 years. Composite replacement on a rebuilt frame is the common answer.

Verified after completion

What people say once the dust is gone

4.9

from 218 reviews (sample)

  • 5 star91%
  • 4 star7%
  • 3 star1%
  • 2 star1%
  • 1 star0%

4.9 Google

4.9 Houzz

4.8 Angi

They told us in week one that the chimney chase was going to be a problem and what it would cost. When it turned out exactly like they said, we stopped worrying about the rest of it. Nine weeks, two change orders, both explained before the work happened.

Rachel SorensenLadue · Kitchen remodelingAugust 2025

The first thing Marcus said was that we needed to fix the water before we spent anything on walls. Nobody else who bid it even mentioned the grading. Two years on, the basement is bone dry.

Anthony PruittKirkwood · Basement finishingNovember 2024

Our house is 120 years old and nothing in it is square. They measured everything twice and the tile still landed exactly where the drawing said it would.

Dee WhitmoreCompton Heights · Bathroom remodelingJune 2025

The first design did not fit the setbacks and they told us straight away instead of letting us fall in love with it. Eight months, on budget, and the roof line looks original from the street.

Miriam AchebeWebster Groves · Home additionsSeptember 2025

They numbered every piece of trim they took off and put it back exactly where it came from. I did not think anyone still did that.

Grace LindqvistTower Grove South · Whole-home renovationMay 2024

They found rot we did not know about, showed us photographs, priced it the same day and kept going. Seven weeks start to finish and we ate out there all September.

Paul NovakClayton · Decks and outdoor livingJuly 2025

Read all 218 reviews

Free estimate

Building in Chesterfield this season

Tell us the street and what you want to change. We will confirm the permitting path in Chesterfield and book a free site visit.

See all service areas

742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.