Basement finishing

Dry first, framed second. Finishing a wet basement just hides the water.

Sample range
$42,000 to $96,000
Time on site
7 to 12 weeks on site
Finished basement family room with warm lighting and new flooring

What we are actually solving

St. Louis basements are stone, brick or poured concrete, and almost all of them move water at some point. Before we frame a single wall we walk the exterior grading, check the downspout discharge, scope the interior drain if there is one, and run a moisture reading on the slab and the walls.

If the basement needs drainage, a sump, a vapour barrier or exterior grading work, that is a separate line item we would rather you spend money on than a finished wall that traps it. Once the space is dry, finishing it is the cheapest square footage you will ever add to a house.

Typical crew: Lead carpenter, framer, drywall crew, electrician, plumber, HVAC

Line by line

What is included

This is the scope you would see in your proposal, written the way we write it rather than the way a brochure does.

Moisture and egress assessment

Slab and wall moisture readings, drainage review, and a check on whether your bedroom plan needs an egress window.

Framing and insulation

Rigid foam against masonry, framed walls held off the wall line, and sound insulation in the ceiling under living space.

Electrical, HVAC and plumbing

Permitted circuits, supply and return runs sized for the new space, and rough-in for a wet bar or full bathroom.

Egress windows and wells

Cut, shored and installed to code with a drained window well when a bedroom is part of the plan.

Ceilings that stay serviceable

Drywall with access panels at valves and clean-outs, or a suspended system where you need the whole plane to open.

Floors that handle humidity

Rigid core vinyl plank, sealed and stained slab, or carpet tile over an underlayment that will not hold water.

Why it matters

Three things that change the outcome

Water first, walls later

We will tell you to fix drainage before we take your money to frame over it.

Legal bedrooms

Egress windows, ceiling height and smoke detection handled so the space counts on an appraisal.

Quiet above and below

Sound insulation and resilient channel where the plan puts a media room under a bedroom.

How it runs

From first call to punch list

The full process
  1. 01

    Phone call

    15 minutes, no visit yet

  2. 02

    Site visit

    About an hour, free

  3. 03

    Design and selections

    Paid agreement, credited back

  4. 04

    Fixed-price proposal

    Line-item scope, no vague lumps

  5. 05

    Permits and pre-construction

    The part nobody photographs

  6. 06

    Construction

    Weekly meetings, daily photos

  7. 07

    Punch list and follow-up

    Be picky, that is the point

Where the money goes

What moves the price on this work

Compare these against any other bid you are holding. If a line is missing from one of them, the prices are not comparable.

  • Existing moisture, drainage and whether a sump is needed
  • Ceiling height and how many obstructions have to be boxed or rerouted
  • Adding a bathroom, which usually means breaking the slab
  • Egress window cuts through stone or poured foundation walls
  • Whether the plan includes a wet bar, gym or separate entrance
Detail from a Buildwell basement finishing project
Basement finishing project in Kirkwood

Case study

A Kirkwood walk-out basement turned guest suite

Drainage first, then 940 square feet with a legal bedroom, a bath and a bar.

Budget
$88,000 to $94,000
Timeline
11 weeks on site
Neighborhood
Kirkwood
Read the case study

Basement finishing questions

Something not covered here? Call us, it is a two minute answer most of the time.

All questions

Not until it is dry. Seasonal dampness usually traces back to grading, gutters or a failed interior drain, and all three are cheaper to fix than a finished wall that has to come back out. We will scope it and give you the honest sequence.

Most municipalities around St. Louis want seven feet of finished ceiling height in habitable space, with limited allowances under beams and ducts. We measure and tell you before design, because it changes what the space can legally be.

Usually yes. If the existing waste line is above the slab you may need an ejector pump; if it is below, we break the slab and tie in. Both are routine, and both get priced after we scope the line.

That comes down to lighting layers, ceiling height and where the egress windows land. We design for three light layers and keep the mechanical boxing tight to the joists so the ceiling plane stays as high as possible.

Free estimate

Ready to price your basement finishing

A free site visit, measurements and photographs, then a written ballpark range within three business days.

See financing options

742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.