Service area
Remodeling in Kirkwood
1920s bungalows, 1950s ranches, 1970s split levels
- County
- St. Louis County
- From our shop
- 18 minutes from our shop
- ZIP codes
- 63122

Working in Kirkwood
Kirkwood is one of our busiest areas and one of the most varied. A block off Adams you are in a 1926 bungalow with plaster and a coal chute. Two streets over you are in a 1978 split level with a walk-out basement and an original kitchen.
The city runs its own building department out of City Hall on Argonne, and the plan reviewers there are among the more responsive in the region. We are usually through review in three to five weeks on a standard remodel.
What Kirkwood houses throw at us
Three things we see here again and again
Split level basements
Walk-out lower levels with heaved patios and drainage that sends water back toward the foundation. Fix the grading first, always.
Galley kitchens with a chimney
The 1950s ranches almost all have a decommissioned flue in the way of the island. Removing it is usually simpler than people expect.
Original 1920s woodwork
Oak and gum trim worth saving. We strip and repair rather than replace it whenever the client wants the character kept.
Most booked in Kirkwood
Services we run here most

A project in Kirkwood
A Kirkwood walk-out basement turned guest suite
Drainage first, then 940 square feet with a legal bedroom, a bath and a bar.
- Budget
- $88,000 to $94,000
- Timeline
- 11 weeks on site
Verified after completion
What people say once the dust is gone
from 218 reviews (sample)
4.9 Google
4.9 Houzz
4.8 Angi
They told us in week one that the chimney chase was going to be a problem and what it would cost. When it turned out exactly like they said, we stopped worrying about the rest of it. Nine weeks, two change orders, both explained before the work happened.
The first thing Marcus said was that we needed to fix the water before we spent anything on walls. Nobody else who bid it even mentioned the grading. Two years on, the basement is bone dry.
Our house is 120 years old and nothing in it is square. They measured everything twice and the tile still landed exactly where the drawing said it would.
The first design did not fit the setbacks and they told us straight away instead of letting us fall in love with it. Eight months, on budget, and the roof line looks original from the street.
They numbered every piece of trim they took off and put it back exactly where it came from. I did not think anyone still did that.
They found rot we did not know about, showed us photographs, priced it the same day and kept going. Seven weeks start to finish and we ate out there all September.
Nearby
Other areas we build in
Free estimate
Building in Kirkwood this season
Tell us the street and what you want to change. We will confirm the permitting path in Kirkwood and book a free site visit.
742 projects since 2009 · 3 year workmanship warranty · Licensed, bonded and lead-safe certified (sample figures)

